Ski resorts Alta Valtellina
Alta Valtellina: planned lifts
All planned lifts in the Alta Valtellina
Overview: planned ski lifts in the Alta Valtellina
Lift projects at ski resorts in the Alta Valtellina (renewal, development and integration)
Total: 7
2 1 4
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Alta Valtellina: planned ski lifts
- Alta Valtellina – limit to
Tourism regions:
Alta Valtellina – switch toMountain ranges:
1-2 out of 2 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Combined installation (6 pers. chair and 10 pers. gondola)
Length: 1508 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Length: 1360 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 251 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable) with bubble
Length: 1620 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
1-2 out of 2 ski resorts